Tray-Cable Power Cords

tray cable 1.1

Tray-Cable Prefabricated Assemblies

Built for Cable-Tray Routing and Mission-Critical Schedules

Type TC/TC-ER
Tray-rated constructions per UL 1277; exposed-run options (TC-ER) available were permitted by code and AHJ.
UL QQYZ
Assemblies produced under documented procedures with component traceability and label serialization.
100% Tested
Continuity & phase-rotation plus Hi-Pot; downloadable digital test certificates per serial number.

Common Tray-Cable Options We Support
Specify conductor size/count, shielding, and identification needs.
Conductor Size & Count
16–2 AWG • 3, 4, or 5 conductors (others on request) • with/without ground.

Identification
Color-coded leads • printed legends • heat-shrink cable ID • serialization.
Assembly Options
Ring-lug or device terminations with strain relief. Pulling grips and bundling for tray placement. Heat-shrink labels mapped to tray zones.

Typical Applications
Overhead tray runs to rack PDUs and row boxes
Equipment branches along cable tray (CRAC/CRAH, pumps, fans)
Pre-terminated sets for rapid install and reduced on-site prep.

Assembly Options
Ring-lug or device terminations with strain relief. Pulling grips and bundling for tray placement. Heat-shrink labels mapped to tray zones
Documentation
Bill of materials with cable specification references. Continuity/phase-rotation & Hi-Pot results. Tray/ label legend for row and rack positions.

FAQ

Frequently Asked Questions

What ratings do your tray-cable assemblies carry?
We build with Type TC/TC-ER tray cable (600 V) per UL 1277 and sell as UL QQYZ wiring assemblies. Temperature rating and construction depend on the selected cable specifications.
When can TC-ER be run outside of tray?
TC-ER permits certain exposed-run applications were supported and protected as required by code. Always confirm route details with the project’s engineer and Authority Having Jurisdiction (AHJ).
Do you provide connectors, lugs, and hardware?
Yes—on request we include ring lugs, gland fittings, strain relief, and related hardware, pre-installed or kitted by tray zone.
What testing is performed?
Continuity and phase-rotation plus Hi-Pot at 2× operating voltage (up to 1.5 kV AC). A digital test certificate is generated and stored per serial number.

Let’s Get Started on Your Project!

Contact us today to discuss how we can enhance your electrical installations and streamline your projects.

Scroll to Top